I ended up mounting the fuel pump and filter under the driver side seat plate. Should be tucked up high enough.
Hoses will get a more permanent mounting solution later on down the road. Still in mock up..

1775761339916.webp


Fabbed up the rear brake light mount. Rear View Mirror tacked into place as well.

1775761368503.webp


1775761381497.webp


Worked on the interior some more. Rear steer valve from RD will be living behind the driver seat.
I need to trim the atlas shifter mount 1-2" to clear the trail soda holders. And I tacked the orbital mount in backwards lol. Gotta fix that..

1775761422235.webp


1775761433774.webp


Heat shield under the passenger seat. Its upside down in the pic..
The reflective portion is doubled up with some Ti insulation sandwiched in between.

1775761464204.webp


Temp sensor modification on the back of the engine block. Heated up the nipple, pulled it out, tapped it and plugged it.
the nipple was going to be in the way of the fuel lines and this bought me some clearance and cleaned it up a little.
Broke the temp sensor so a new one got installed.

1775761495095.webp


1775761508003.webp
 
To Do:

  1. Fabricate aluminum oil pan In progress Thanks @SMKYTXN
  2. Buy Battery and mount Battery box - Done
  3. Layout fuel system components and plumb system- Done
  4. mount storage rack to lower support bar
  5. Measure and order Radiator hoses - Done, need to finish Driver side under throttle body.
  6. Drink beer in shop - Always!
  7. Weld out and mount Brake pedal
  8. Mount Accelerator Pedal
  9. Swap orbital mount, mount orbital, steering wheel -Done ish
  10. Lay out the Steering system components will be located under in the engine bay -in progress
  11. Plumb steering , rear steer, cooler, filter, resi, pump, steering cylinder hoses
  12. Work on front driveshaft midship mount- in progress
  13. Build front driveshaft - In progress
  14. Order parts for Rear Driveshaft
  15. Fab front bump bar- Done!
  16. Mock up Headlights
  17. Mock up Rock light locations
  18. Drink beer in shop - ONGOING
  19. tack in harness belt mounts- rears are in need to tack in the lap belt mounts
  20. Design Dog house - in progress Lay out components
  21. Layout IC7 display, Master power disconnect, shifter, usb charger on front panel.
  22. Weld out Doghouse
  23. Plumb Turbo to Throttle body - should be pretty sweet in Carbon fiber - Thanks @SMKYTXN
  24. Drink beer in shop -Check!
  25. Floor pans/firewall/ expanded metal for diver and passenger side - in progress
  26. Figure out skid plate mounting for Transmission and engine
  27. Spend a lot more $$$ on parts -in progress
  28. Layout SwitchPros RCR12
  29. Layout power supply wiring from battery
  30. Finish brake rotor and caliper installation -Done
  31. Plumb brake system and brake light switch -In progress
  32. Need to swap the front 3rd to the rear and install the new 3rd in the front
  33. install TG axle seals (4) in both housings
  34. 05 up Direct Drive total spline 1550 outers from Branik, inner 40 spline shafts from ECGS/Branik--EEEKK $$!
 
Build is looking great, love the to-do list approach - keeps you honest on the build! Mounting the fuel pump under the seat plate is smart on a buggy for protection, just make sure you're running a good quality braided stainless AN line and a quality filter upstream of the pump since that 3RZ can be finicky about fuel pressure consistency, especially if you end up adding boost later.
 
Thanks. I have a Radium Fuel filter upstream of the pump. All of the fuel delivery is braided SS hose/AN fittings. It's getting boosted right out of the box...
 
HA! yeah just a little slow going. Trying to find what little time I have to work on it.
 
Floors are basically done. Working on a heat shield for the turbo down pipe now and the center doghouse layout/fab. it will probably be out of steel.. More on that later.. going to do some more finish welding, wiring layout, plumbing.... the hoses will need to be moved on the other side of the Atlas shifters. I am going to try to mount the pain power disconnect between the seats to buy me a little room on on the console face. Running out of room quickly lol.

I may farm out some work to a buddy to clean up a few things on the plumming side. Gas pedal location still needs to be finalized and the motor mounts need to be boxed in. I put the seats back in and the pedal is pretty close where it needs to live. I need to figure out a base for it and trim it down a bit so it doesn't hit the intake.

I need to swap the front 3rd to the rear (since that was what it was set up for) for a test fit and to check for clearance issues that I had with the GW 3rd and the inner portion of the pumpkin.. I'm sure the front and rear will need more grinding than I have already done. Also need to measure for inner axle shafts. I have a 9" jig to get those measurements. Front an rear inner shafts SHOULD theoretically be the same, but I'm going to double check anyways. That is the last big purchase I need to do.

I need to mock up the rear driveshaft and get it cut to size, then on to the belly pan and oil pan skids once my custom oil pan is in hand.

I got the radiator surge tank tacked in and 3rd brake light burned in, and the roof reattached.


1793916250472.webp


1793916279471.webp


1793916305904.webp


1793916337541.webp


1793916370318.webp


1793916388737.webp
 